Fast-Deploy Temporary Skidder Bridges for Sewer Project in Union County, NC
Mustang Extreme Environmental Services Custom Designed Skidder Bridges To complete a year-long, $14.5 million new gravity sewer interceptor project in Union County, NC, our customer needed a fleet of fast-deploy bridges that would both protect stream beds from disruption and ensure safe site access for crew and equipment. Mustang Extreme fabricated 8 custom, engineer-rated bridges
Prefabricated Bridge Installation Over Two Waterways for a Power Transmission Project
Mustang Extreme Environmental Services’ power transmission customer needed to cross two waterways to access their jobsite with heavy equipment traffic. Our prefabricated bridges were rapidly deployed and installed, in less than a day. These steel bridges solved the requirement of engineer-rated weight capacity, without holding up the work schedule. Contact us about your project. https://lnkd.in/eZW3F9u5 #temporarybridges