Prefabricated Bridge Installation Over Two Waterways for a Power Transmission Project
Mustang Extreme Environmental Services’ power transmission customer needed to cross two waterways to access their jobsite with heavy equipment traffic. Our prefabricated bridges were rapidly deployed and installed, in less than a day. These steel bridges solved the requirement of engineer-rated weight capacity, without holding up the work schedule.
Facing similar challenges? We can help.



