EXPERIENCE BUILT BY THE BILLIONS

Prefabricated Bridge Installation Over Two Waterways for a Power Transmission Project

Mustang Extreme Environmental Services’ power transmission customer needed to cross two waterways to access their jobsite with heavy equipment traffic. Our prefabricated bridges were rapidly deployed and installed, in less than a day. These steel bridges solved the requirement of engineer-rated weight capacity, without holding up the work schedule. Contact us about your project. https://lnkd.in/eZW3F9u5 #temporarybridges

Ranch Pond Installation in Wimberly, Texas

Did you know one of our many specialties is installing ranch ponds? So far this year Mustang Extreme Environmental Services has installed more than 20 ranch ponds – just in South Texas. Able to install any shape, size and design, our crews are expert in constructing beautiful, functional ponds in any environment. Fisheries, recreational ponds,

Geosynthetic Liner Installation for a Leach Pad Expansion at a Gold Mine in Bullhead City, AZ

Despite sweltering heat and windy conditions, Mustang Extreme Environmental Services was able to complete this leach pad expansion on budget and schedule at the Bullhead City, AZ gold mine. This third project we completed for Golden Vertex was a multilayer installation of approximately 1.8 million square feet of 80 mil LLDPE Textured Liner and 1.7

Multi-layer Geosynthetic Liner Installation at a Landfill in Palmdale, California

Another multi-layer landfill installation in the books! This one is an 11-acre cell in Palmdale, CA. For a change, there were no rough weather conditions for the Mustang Extreme Environmental Services crew to battle, making it a pretty routine project , which makes everyone happy!

Geosynthetic Liner, Aeration and Leak Detection System Installation at a Produced Water Treatment Facility in West Texas

Work in progress for a produced water treatment operation outside Big Spring in West Texas! The project includes 3 ponds, totaling over 1 million sf of liner. This pond features a spill over berm to catch solids. In the coming weeks, the Mustang Extreme Environmental Services crew will install stingers, manifolds, an aeration system and

Cell Installation at a Solid Waste Landfill in Fayette

“I wanted to reach out and let you know that we were very pleased with your crew’s performance at the Fayette landfill a few weeks ago. I know the circumstances weren’t Ideal, but we appreciate everyone working hard to meet the goals.” Project Manager When you get emails like this one about a tough project, it

Geocomposite Liner Install for an Energy Waste Landfill in New Mexico

Mustang Extreme Environmental Services installs landfills for all uses across the country. This is an example of a project in the Delaware Basin of NM where we are installing just under 3 million sq ft of geocomposite liner for an Energy Waste Landfill.

Dual, Million-barrel Produced Water Pond Installation in the Permian Basin

We are proud to share details of a best-in-class turnkey installation of dual, million-barrel produced water ponds in the Permian Basin. What sets Mustang Extreme Environmental Services apart? Stellar craftsmanship by our experienced crew with exceptional project management. Intensive QAQC inspection by our highly trained specialists. The Mustang Extreme proprietary M.E.G.A. Remote Leak Detention and

1.6 million sq. ft. of Geosynthetic Liner Used at 22 Fish Hatchery Ponds for Texas Parks & Wildlife Department

Composite Matting Installation for Precision Drill Rig Platform at Cornell University