Despite Snow, Rain and High Winds Mustang Crews Complete 14-acre, Multi-layer Landfill Installation Ahead of Schedule
The Mustang Extreme Environmental Services crews often face challenges from the weather while installing liner, but for this 2-phase landfill project in the Pacific Northwest, they have endured it all: snow, rain, and high winds. Highly experienced and trained to skillfully handle all conditions, the crew successfully completed this multi-layer, 14-acre project one week ahead
Private, Recreational Ranch Pond Installation
Private ranch pond ready for boating and fishing! Another example of the precision craftsmanship of the Mustang Extreme Environmental Services team. We build ponds and lakes of all sizes, designed with a wide range of features. Erosion control for boating applications, wading areas for swimming or livestock, coves, and shallow areas to create spawning habitats
Fast-Deploy Cl02 Mobile Unit Restores AST Water in Just Four Days
Solving complex and difficult water quality issues is one of our specialties. For an operator in Howard County, TX, extremely high bacteria levels and solids made water stored in an AST unusable for frac. Unsuccessful attempts to clean the water left the operator few options. Frustrated and in need of a remedy, they contacted the
Composite Mats with Geotextile Fabric Underlayment Used to Create Compliant Frac Pad in Pennsylvania
A great example of a compliant frac pad drill site in Pennsylvania. Mustang Extreme Environmental Services installed interlocking composite mats with a geotextile fabric underlayment to ensure containment of an upright tank farm. The extrusion welding shows off our expert craftsmanship.
Geosynthetic Lining Installation at a Mining Site in the Southwest U.S.
Another example of Mustang Extreme Environmental Services providing excellent geosynthetic liner installation while maintaining an impeccable safety culture and environment for one of our great mining customers in the US Southwest. Whether it is mining, energy, solid waste or agriculture our skilled and tenured crews are prepared and trained in the highest quality standards.
Fast-Deploy Temporary Skidder Bridges for Sewer Project in Union County, NC
Mustang Extreme Environmental Services Custom Designed Skidder Bridges To complete a year-long, $14.5 million new gravity sewer interceptor project in Union County, NC, our customer needed a fleet of fast-deploy bridges that would both protect stream beds from disruption and ensure safe site access for crew and equipment. Mustang Extreme fabricated 8 custom, engineer-rated bridges
Composite Mats Used to Create Access Road Through a Proctor & Gamble Property
Duke Energy needed to create an access road through Proctor & Gamble’s property, while protecting their new asphalt parking lot from heavy tracked equipment. Mustang Extreme Environmental Services was able to mobilize 17,000 square feet of interlocking MegaDeck mats, to provide a seamless roadway and staging area. Duke contractors accessed the site daily, driving excavators
2.7 million Sq. Ft. of Geosynthetic Liner Installed for a Landfill Expansion Project
Another landfill expansion project complete! This job required 2.7 million square feet of liner, including GCL Bento Liner, 60 mil HDSST, 250 mil geo composite, 60 mil HDPE, 200 mil geo composite, and 200 mil geo net. The experienced Mustang Extreme Environmental Services crew completed the job on time, with no issues and a perfect
Iron Sulfide Buildup in Injection Well Piping Treated in Two Days Using Cl02
Iron sulfide buildup in injection well piping caused critical delays at a main centralized oil and gas gathering facility in the Delaware Basin. Using the Mustang Aria 5 Cl02 mobile unit, Mustang Extreme Environmental Services water treatment specialists successfully cleaned out the pipe in just 2 days, allowing normal frac operations to resume. Having issues