EXPERIENCE BUILT BY THE BILLIONS

Private, Recreational Ranch Pond Installation

Private ranch pond ready for boating and fishing! Another example of the precision craftsmanship of the Mustang Extreme Environmental Services team. We build ponds and lakes of all sizes, designed with a wide range of features. Erosion control for boating applications, wading areas for swimming or livestock, coves, and shallow areas to create spawning habitats

Fast-Deploy Cl02 Mobile Unit Restores AST Water in Just Four Days

Solving complex and difficult water quality issues is one of our specialties. For an operator in Howard County, TX, extremely high bacteria levels and solids made water stored in an AST unusable for frac. Unsuccessful attempts to clean the water left the operator few options. Frustrated and in need of a remedy, they contacted the

Composite Mats with Geotextile Fabric Underlayment Used to Create Compliant Frac Pad in Pennsylvania

A great example of a compliant frac pad drill site in Pennsylvania. Mustang Extreme Environmental Services installed interlocking composite mats with a geotextile fabric underlayment to ensure containment of an upright tank farm. The extrusion welding shows off our expert craftsmanship.

Geosynthetic Lining Installation at a Mining Site in the Southwest U.S.

Another example of Mustang Extreme Environmental Services providing excellent geosynthetic liner installation while maintaining an impeccable safety culture and environment for one of our great mining customers in the US Southwest. Whether it is mining, energy, solid waste or agriculture our skilled and tenured crews are prepared and trained in the highest quality standards.

Fast-Deploy Temporary Skidder Bridges for Sewer Project in Union County, NC

Mustang Extreme Environmental Services Custom Designed Skidder Bridges To complete a year-long, $14.5 million new gravity sewer interceptor project in Union County, NC, our customer needed a fleet of fast-deploy bridges that would both protect stream beds from disruption and ensure safe site access for crew and equipment. Mustang Extreme fabricated 8 custom, engineer-rated bridges

Composite Mats Used to Create Access Road Through a Proctor & Gamble Property

Duke Energy needed to create an access road through Proctor & Gamble’s property, while protecting their new asphalt parking lot from heavy tracked equipment. Mustang Extreme Environmental Services was able to mobilize 17,000 square feet of interlocking MegaDeck mats, to provide a seamless roadway and staging area. Duke contractors accessed the site daily, driving excavators

2.7 million Sq. Ft. of Geosynthetic Liner Installed for a Landfill Expansion Project

Another landfill expansion project complete! This job required 2.7 million square feet of liner, including GCL Bento Liner, 60 mil HDSST, 250 mil geo composite, 60 mil HDPE, 200 mil geo composite, and 200 mil geo net. The experienced Mustang Extreme Environmental Services crew completed the job on time, with no issues and a perfect

Iron Sulfide Buildup in Injection Well Piping Treated in Two Days Using Cl02

Iron sulfide buildup in injection well piping caused critical delays at a main centralized oil and gas gathering facility in the Delaware Basin. Using the Mustang Aria 5 Cl02 mobile unit, Mustang Extreme Environmental Services water treatment specialists successfully cleaned out the pipe in just 2 days, allowing normal frac operations to resume. Having issues

Prefabricated Bridge Installation Over Two Waterways for a Power Transmission Project

Mustang Extreme Environmental Services’ power transmission customer needed to cross two waterways to access their jobsite with heavy equipment traffic. Our prefabricated bridges were rapidly deployed and installed, in less than a day. These steel bridges solved the requirement of engineer-rated weight capacity, without holding up the work schedule. Contact us about your project. https://lnkd.in/eZW3F9u5 #temporarybridges

Geosynthetic Liner Installation for a Leach Pad Expansion at a Gold Mine in Bullhead City, AZ

Despite sweltering heat and windy conditions, Mustang Extreme Environmental Services was able to complete this leach pad expansion on budget and schedule at the Bullhead City, AZ gold mine. This third project we completed for Golden Vertex was a multilayer installation of approximately 1.8 million square feet of 80 mil LLDPE Textured Liner and 1.7

Need Help? Contact Us About Your Next Project