2.7 million Sq. Ft. of Geosynthetic Liner Installed for a Landfill Expansion Project
Another landfill expansion project complete! This job required 2.7 million square feet of liner, including GCL Bento Liner, 60 mil HDSST, 250 mil geo composite, 60 mil HDPE, 200 mil geo composite, and 200 mil geo net. The experienced Mustang Extreme Environmental Services crew completed the job on time, with no issues and a perfect
Prefabricated Bridge Installation Over Two Waterways for a Power Transmission Project
Mustang Extreme Environmental Services’ power transmission customer needed to cross two waterways to access their jobsite with heavy equipment traffic. Our prefabricated bridges were rapidly deployed and installed, in less than a day. These steel bridges solved the requirement of engineer-rated weight capacity, without holding up the work schedule. Contact us about your project. https://lnkd.in/eZW3F9u5 #temporarybridges
Refinery Retention Pond Installation in Tulsa, Oklahoma
Mustang Extreme Environmental Services recently completed a Tulsa Refinery Retention Pond.
330,000 Sq. Ft. Produced Water Pond Installation in South Texas
Mustang Extreme Environmental Services recently completed this 330,000 square foot produced water pit in South Texas.
Ranch Pond Installation in Wimberly, Texas
Did you know one of our many specialties is installing ranch ponds? So far this year Mustang Extreme Environmental Services has installed more than 20 ranch ponds – just in South Texas. Able to install any shape, size and design, our crews are expert in constructing beautiful, functional ponds in any environment. Fisheries, recreational ponds,