Underdrain Installation Resolves Water Seepage Issues
While excavating for a new freshwater pond in Shiner, TX it was discovered water was seeping up through the ground, which would have created immeasurable problems for our customer.
Our South Texas crews got to work installing 1800 LF of perforated pipe and moving countless dump trucks of river rock to prepare the site for a 1.5 mm bbl pond.
Without rain delays the project – which included installation of the underdrain, 954,000 SF each of 10oz geo textile and 40mil HDPE, plus QAQC – would have been completed in 5 days or less.
Facing similar challenges? We can help.
"*" indicates required fields








