Protective Drainage and Containment System Created for a Logistics Company

The Mustang Extreme South Texas crew recently completed another complex liner installation project – this time for a logistics company needing to create a secondary containment and collections system underneath concrete pads. The pads will store shipping containers moving various chemicals. As a precaution, 400,000 square feet of liner was installed over the porous soil with concrete pads laid over top. The highly skilled and experienced Mustang Extreme crew created tight seams and trenches around concrete pillars, rebar, and other obstacles.

To meet the very aggressive installation schedule, concrete was installed 24/7, requiring the Mustang crew to be on standby 24/7 to repair any damage caused by the concrete equipment.

We can’t say enough about the commitment and dedication of our crews to meet every challenge, consistently and continually demonstrating their craftsmanship and professionalism to deliver the highest-quality work in the business.


Request More Information

Facing similar challenges? We can help.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Speak With an Expert

Need Help? Contact Us About Your Next Project