EXPERIENCE BUILT BY THE BILLIONS

Custom Aeration Water Treatment System Completed on Dual, 500,000 BBL Ponds in Midland

The Mustang Extreme Water Treatment Team recently put the finishing touches on dual, 500,000 bbl produced water ponds in the Permian Basin.

As soon as the Midland-based Mustang liner crew and QAQC team completed installation of the liner, the water treatment team went to work installing a subsurface aeration and chemical injection system and the M.E.G.A Remote Monitoring System. The operator will have 24/7, real-time data on the quality and volume of the water stored in the ponds.

Our approach to water treatment is science-based and focused on meeting the specific requirements of each operation. Careful testing, site evaluation and understanding of the requirements of the operation are the basis of the design for each customized system we install.

 


Request More Information

Facing similar challenges? We can help.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Speak With an Expert

Produced-water-pond-liner-installation
Need Help? Contact Us About Your Next Project