Don’t Let Waterways Delay Your Solar Build
Cross waterways quickly, without permit delays, excavation, or site disruption.
Solar projects often span hundreds or thousands of acres, across farmland, landfills, and environmentally sensitive areas where access isn’t always straightforward. When protected waterways or buried utilities are in the way, traditional culverts can trigger complex permitting and delay projects for months.
Mustang Extreme temporary bridges provide immediate access to solar farm construction sites without disturbing banks or streambeds. Our portable, engineer-rated systems install in less than a day and, in most cases, eliminate the need for permitting altogether, keeping your project on schedule.
Rent, rent-to-own, or purchase options give solar EPCs the flexibility to choose the right solution, whether it’s a short-term access need or a long-term infrastructure investment.
Mustang Extreme Temporary Bridge Options
- Hinged Bridges – Spans of up to 42′
- Steel Panel Bridges – Spans up to 60’
- Hybrid Bridges – Spans of up to 62′
- Long-Span Bridges – Spans up to 95′
- Custom/Skidder Bridges – Spans of up to 17′
For a complete listing of sizes, load ratings and transportation requirements:
Download Our Prefabricated Temporary Bridge Spec Sheet
Call 817-441-1235 to speak with a Mustang Extreme bridge specialist to determine the best, most efficient option for your solar project.
"*" indicates required fields
Recent Solar Construction Projects
Solar Farm Construction – Louisville, Kentucky
- To gain access to their site with CAT 740 haul trucks and heavy tracked equipment, an EPC customer needed to cross a federally protected waterway with no bank disturbances or digging allowed. Attaining permits for traditional culverts would have set the project back months
- The Mustang team fabricated an engineer-rated 12’ x 30’ Steel Panel Bridge and deployed it to the site within 10 days. Unload and installation took less than a day.
- The three 4’ x 30’ modular bridge sections were easily transferred from flatbed to Morooka tracked vehicle, for transport through winding backwoods to the install point.
- Customer was able to utilize materials onsite (crane mats and stone rip-rap) for both abutment support and on/off ramps.
- To gain access to their site with CAT 740 haul trucks and heavy tracked equipment, an EPC customer needed to cross a federally protected waterway with no bank disturbances or digging allowed. Attaining permits for traditional culverts would have set the project back months
- The Mustang team fabricated an engineer-rated 12’ x 30’ Steel Panel Bridge and deployed it to the site within 10 days. Unload and installation took less than a day.
- The three 4’ x 30’ modular bridge sections were easily transferred from flatbed to Morooka tracked vehicle, for transport through winding backwoods to the install point.
- Customer was able to utilize materials onsite (crane mats and stone rip-rap) for both abutment support and on/off ramps.



Substation Construction - Ashville, Ohio
- 45’ Hybrid Temporary Bridge
- Load rated to 94-tons to accommodate heavy haul trucks
- Unloaded and installed via 110-ton crane, in under 2 hours
- Bridge will be onsite for 1.5 years, so customer elected to build concrete and rebar footers

