EXPERIENCE BUILT BY THE BILLIONS

Iron Sulfide Buildup in Injection Well Piping Treated in Two Days Using Cl02

Iron sulfide buildup in injection well piping caused critical delays at a main centralized oil and gas gathering facility in the Delaware Basin.

Using the Mustang Aria 5 Cl02 mobile unit, Mustang Extreme Environmental Services water treatment specialists successfully cleaned out the pipe in just 2 days, allowing normal frac operations to resume.


Request More Information

Facing similar challenges? We can help.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Speak With an Expert

Need Help? Contact Us About Your Next Project