EXPERIENCE BUILT BY THE BILLIONS

Dual Pond Installation for Commercial Re-Use in the Powder Basin of Wyoming

This oil and gas project in the Powder River Basin of Wyoming features dual 400,000 BBL ponds for commercial re-use. Mustang Extreme had previously installed the four ponds for Freshwater use at the same site.


Request More Information

Facing similar challenges? We can help.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Speak With an Expert

Need Help? Contact Us About Your Next Project