1.5 Million SQFT of Liner Installed at a Power Plant in Texas
The San Miguel Electric Cooperative, Inc., a lignite-fueled power plant in Christine, Texas, produces 391 megawatts of affordable, reliable electricity across 42 south Texas counties. The Cooperative engaged Mustang Extreme Environmental Services to supply and install 1.5 million square feet of geosynthetic material. The installation was successfully completed on time to meet the customer’s aggressive operational schedule.
Facing similar challenges? We can help.
"*" indicates required fields





